We should Develop and recommend a management system for project cost.
– 1 poster – A1 format. Around 800 words but can have more graphics than just words and poster has to have a link with the management system for project cost This will summaries
analysis and proposed solutions graphically.
Second section
Analysis
– Management system for project cost. 300 words.
– We can go for already existed management systems and develop a reasonable one for our case.
– Reasoned justifications must be related to the assumed project environment and organisational characteristics
The project is to add a new unit to produce the chocolate. For example cost estimation will treat the installation of equipments with the pipelines and quality sensors to produce a final product which is (Chocolate)
Free available references (doi)
No previous thesis to be referenced